Day 2 / by ari kalinowski

Today the site for the structure was cleared and the two base platforms of the structure were constructed.

Building materials and tools.

The Landscaping team cleared and leveled out the site for the structure.

The landscaping team, Anne, Adam, Sally and Chihao

The landscaping team, Anne, Adam, Sally and Chihao

The construction team built the two platforms that comprise the floor and subfloor of the structure.

Construction team, Terri, Jon, David and Isabelle

Construction team, Terri, Jon, David and Isabelle

The first platform laid in place.

The first platform laid in place.

Tomorrow we will lay the second platform down along with floorboards and assemble the walls.

Second platform, ready to go.

Second platform, ready to go.