Day 3 / by ari kalinowski

Yesterday we laid the platform for the floor of the structure into place and the support structure for the roof was built.

Floor platform being laid into place.

Isabelle collects rocks from the river to create a drainage system around the structure.

The frames for the walls were assembled and the fabric for the walls/projection screens were stretched. Then the floorboards were painted with a clear coat to make them smooth for bare feet.

One screen stretched and ready to become a wall.

Terri stands inside the pyramid roof resting on floor platform.